Highland Park Second Floor Addition and New Foundation

Home Style: Craftsman Bungalow
Design Style: Transitional
Project Completion Date: June 2022

This was a major whole house project that actually lifted the home and installed a new insulated concrete foundation (ICF) then built a front addition and added a full second floor drastically enlarging the size of the home.  Re-pouring the basement walls allowed for full 8’ceiling height. The basement remodel included full bath, family room with gas fireplace and stone facade, walnut wetbarand utility room with laundry. Once the house was set down on the new foundation a new front addition with open porch, stone facade, and foyer with open stairway was added to the home.  A new 2nd floor with master suite, full laundry, 2 bedrooms, guest bath and open loft area was also added. Main level remodel included a new gas fireplace in front living room, closing existing side entry and converting the rear bedroom to pantry and mudroom with rear entry. New windows were installed throughout the main floorThe entire home was painted.

 

After Photos:

     

More Stories
The Perfect Man Cave: 5 Designs to Consider
Call Now